From drawing set to site: closing the RFI gap

From drawing set to site: closing the RFI gap

From drawing set to site: closing the RFI gap

A practical review cadence that cut open RFIs at handover on a sample programme.

A practical review cadence that cut open RFIs at handover on a sample programme.

Written by

CIVITEC Engineering

We introduced a weekly constructability review where the site engineer walks the next six weeks of work through the model with the designer.

Requests for information are a symptom: they show where the drawings and the site disagree. The earlier you find those gaps, the cheaper they are.

We introduced a weekly constructability review where the site engineer walks the next six weeks of work through the model with the designer. Every question raised is logged and assigned before it becomes a formal RFI.

The number of open RFIs at handover fell sharply, and the questions that remained were genuine design decisions rather than coordination errors.

Sample article — replace with your own content.

Request for proposal

Have a projecton the drawing board?

Tell us about scope, location, budget and timeline. A project director replies within two working days (sample commitment).

Start a proposal

Create a free website with Framer, the website builder loved by startups, designers and agencies.