Delivery models
GC · CM at-risk · Design-build
Self-perform
Concrete, steel, civils
Typical value
$15M – $450M
Established
1998 · 3 offices
12 sample projects. Every one on the record.
§ 02 — Portfolio index
Filter the portfolio by sector. Every line is a CMS item with its own case study — client, delivery model, value and duration on one sheet.
All projects are fictional sample content
§ 03 — Project map
- P—031Harbour Point TowerChicago, IL
- P—027Kingsgate Science CentreMadison, WI
- P—035Eastfield Logistics HubJoliet, IL
- P—038Northgate Health CampusMilwaukee, WI
- P—104Valley Link ViaductBoise, ID
- P—098Riverside Water WorksSpokane, WA
- P—109Crossharbour TunnelSeattle, WA
- P—093North Quay ExtensionTacoma, WA
- P—214Ardent DC-3 CampusDallas, TX
- P—198Corvan Fill-Finish FacilityRaleigh, NC
- P—207Halden Process ExpansionBaytown, TX
- P—221Kestrel 400 kV SubstationAbilene, TX
Plotted by coordinates · sample projects and offices
§ 05 — Services & sectors
§ 06 — Delivery lifecycle
- S1 — Stage
Engineering
Feasibility, design development and value engineering by in-house structural, civil and MEP teams.
- S2 — Stage
Planning
Programme, logistics, phasing and constructability reviews before a single permit is filed.
- S3 — Stage
Procurement
Trade packages, long-lead equipment and supply-chain risk managed against one programme.
- S4 — Stage
Construction
Self-performed concrete, steel and civils, with specialist partners coordinated on site.
- S5 — Stage
Handover
Testing, commissioning, digital O&M records and a defects period that closes on time.

§ 07 — Safety & quality
0.29
TRIR · rolling 12 mo
1,412
Days without lost time
QMS · EMS · OHS
Add your certifications
§ 08 — Clients & partners
Dana Whitfield
Director of Capital Projects, sample client
Halvorsen Estates
MERIDIAN
Union Quay
Aldermoor Health
KINGSGATE
Northline Partners
Client names and testimonial are fictional sample content
§ 09 — Insights

Engineering knowledge
Oct 2026
Lower-carbon concrete without the schedule penalty
What we have learned specifying blended-cement mixes on fast-track frames — strength gain, curing and the conversations to have early.

Project updates
Sep 2026
From drawing set to site: closing the RFI gap
A practical review cadence that cut open RFIs at handover on a sample programme.

Technical article
Aug 2026
Designing steel connections for erection, not just for load
Why the erector should sit in the connection-design review — and what changes when they do.

§ 10 — Careers
Engineers who build, builders who engineer. Join a team where graduates work on real projects from their first week.
06 open roles · 1998–today













