Insights

Project updates
5 min
From drawing set to site: closing the RFI gap
A practical review cadence that cut open RFIs at handover on a sample programme.

Technical article
9 min
Designing steel connections for erection, not just for load
Why the erector should sit in the connection-design review — and what changes when they do.

Industry news
6 min
Building beside a live hospital: what clinical teams need from contractors
Infection control, shutdown protocols and trust — lessons from working next to operating departments.

Engineering knowledge
8 min
Prefabricated MEP: where offsite pays back
Risers, plant skids and corridor racks — the modules that save time on site, and the ones that do not.

Company announcements
4 min
Opening our 2027 graduate programme
Two years, four placements and a mentor for every graduate engineer.

