12 sample projects · 8 sectors
Buildings, infrastructure and industrial facilities — each with its client, delivery model, value and duration on the record.

P—031
Completed
Commercial
·
Chicago, IL
Harbour Point Tower
A 38-level mixed-use tower, opened six weeks early
Delivery
CM at-risk
Value
$310M
Height
148 m

P—027
Completed
Public Sector
·
Madison, WI
Kingsgate Science Centre
A research building that stayed open to students throughout
Delivery
Design-build
Value
$142M
Gross area
21,400 m²

P—035
Completed
Industrial
·
Joliet, IL
Eastfield Logistics Hub
86,000 m² of logistics space, enclosed before winter
Delivery
Design-build
Value
$96M
Building length
412 m

P—038
In progress
Healthcare
·
Milwaukee, WI
Northgate Health Campus
A 220-bed hospital wing built beside a live emergency department
Delivery
GC
Value
$265M
Capacity
220 beds

P—104
In progress
Infrastructure
·
Boise, ID
Valley Link Viaduct
A 1.6 km curved viaduct built without closing the valley road
Delivery
Design-build
Value
$420M
Length
1.6 km

P—098
Completed
Energy & Utilities
·
Spokane, WA
Riverside Water Works
Treatment capacity doubled while the old works stayed live
Delivery
EPC
Value
$188M
Capacity
240 ML/d

P—109
In progress
Transportation
·
Seattle, WA
Crossharbour Tunnel
A twin-bore road tunnel holed through 11 days ahead
Delivery
Alliance
Value
$760M
Bore length
2.3 km

P—093
Completed
Infrastructure
·
Tacoma, WA
North Quay Extension
A deep-water quay extension delivered between two shipping seasons
Delivery
Design-build
Value
$134M
Quay length
480 m

P—214
In progress
Energy & Utilities
·
Dallas, TX
Ardent DC-3 Campus
A 48 MW data hall energised in phases, with zero downtime
Delivery
MEP design-build
Value
$520M
IT load
48 MW

P—198
Completed
Healthcare
·
Raleigh, NC
Corvan Fill-Finish Facility
A GMP fill-finish suite validated first time
Delivery
EPCM
Value
$210M
Clean-room class
ISO 7

P—207
Completed
Industrial
·
Baytown, TX
Halden Process Expansion
A process expansion tied in during a single 21-day shutdown
Delivery
EPC
Value
$640M
Pipe rack
1.8 km

P—221
Completed
Energy & Utilities
·
Abilene, TX
Kestrel 400 kV Substation
A 400 kV substation energised to the grid operator's date
Delivery
EPC
Value
$155M
Voltage
400 kV
All projects are fictional sample content

