Eastfield Logistics Hub

P—035

412 m

Building length

Eastfield Logistics Hub

Eastfield Logistics Hub

Eastfield Logistics Hub

Client

Logistics operator

Client

Logistics operator

Location

Joliet, IL

Sector

Industrial

Delivery

Design-build

Value

$96M

Duration

14 months

Status

Completed

Year

2026

§ 01 — Overview

86,000 m² of logistics space, enclosed before winter

86,000 m² of logistics space, enclosed before winter

02

The challenge

The challenge

An 86,000 m² distribution centre that had to be weathertight before the first frost to protect the slab programme.

An 86,000 m² distribution centre that had to be weathertight before the first frost to protect the slab programme.

03

Engineering approach

Engineering approach

Tilt-up panels were cast on the slab in parallel with the steel roof, and the design was frozen in three packages so procurement could start in week two.

Tilt-up panels were cast on the slab in parallel with the steel roof, and the design was frozen in three packages so procurement could start in week two.

04

Execution

Execution

The building was enclosed eleven days before the target, allowing the floor slab to be poured indoors through the winter.

The building was enclosed eleven days before the target, allowing the floor slab to be poured indoors through the winter.

§ 05

Key metrics

412 m

Building length

1,120

Tilt-up panels

148

Dock doors

11 days

Enclosed early

Request for proposal

Planning somethingsimilar?

Tell us about scope, location, budget and timeline. A project director replies within two working days (sample commitment).

Start a proposal

Create a free website with Framer, the website builder loved by startups, designers and agencies.