Halden Process Expansion

P—207

1.8 km

Pipe rack

Halden Process Expansion

Halden Process Expansion

Halden Process Expansion

Client

Chemicals producer

Client

Chemicals producer

Location

Baytown, TX

Sector

Industrial

Delivery

EPC

Value

$640M

Duration

36 months

Status

Completed

Year

2026

§ 01 — Overview

A process expansion tied in during a single 21-day shutdown

A process expansion tied in during a single 21-day shutdown

02

The challenge

The challenge

A process expansion that had to be tied into an operating plant during a single planned shutdown.

A process expansion that had to be tied into an operating plant during a single planned shutdown.

03

Engineering approach

Engineering approach

Pre-assembled pipe-rack modules were built offsite, and every tie-in was planned hour by hour with plant operations.

Pre-assembled pipe-rack modules were built offsite, and every tie-in was planned hour by hour with plant operations.

04

Execution

Execution

All 214 tie-ins were completed within the 21-day shutdown, and the plant restarted on the planned date.

All 214 tie-ins were completed within the 21-day shutdown, and the plant restarted on the planned date.

§ 05

Key metrics

1.8 km

Pipe rack

214

Tie-ins

21 days

Shutdown

On date

Restart

Request for proposal

Planning somethingsimilar?

Tell us about scope, location, budget and timeline. A project director replies within two working days (sample commitment).

Start a proposal

Create a free website with Framer, the website builder loved by startups, designers and agencies.