North Quay Extension

P—093

480 m

Quay length

North Quay Extension

North Quay Extension

North Quay Extension

Client

Port authority

Client

Port authority

Location

Tacoma, WA

Sector

Infrastructure

Delivery

Design-build

Value

$134M

Duration

22 months

Status

Completed

Year

2024

§ 01 — Overview

A deep-water quay extension delivered between two shipping seasons

A deep-water quay extension delivered between two shipping seasons

02

The challenge

The challenge

A deep-water quay extension that had to be built between two shipping seasons.

A deep-water quay extension that had to be built between two shipping seasons.

03

Engineering approach

Engineering approach

Combi-wall piles were driven from a jack-up barge while the deck was precast on land, so marine and land works ran in parallel.

Combi-wall piles were driven from a jack-up barge while the deck was precast on land, so marine and land works ran in parallel.

04

Execution

Execution

The quay was handed back to the port operator before the first vessel of the new season was due.

The quay was handed back to the port operator before the first vessel of the new season was due.

§ 05

Key metrics

480 m

Quay length

286

Combi-wall piles

9,600

Armour units

Met

Season window

Request for proposal

Planning somethingsimilar?

Tell us about scope, location, budget and timeline. A project director replies within two working days (sample commitment).

Start a proposal