Location
Seattle, WA
Sector
Transportation
Delivery
Alliance
Value
$760M
Duration
52 months
Status
In progress
Year
2028
§ 01 — Overview

02
03


04
§ 05
Key metrics
2.3 km
Bore length
18,400
Ring segments
11 days early
Breakthrough
Within limits
Settlement
§ 06Related projects

P—031
Completed
Chicago, IL
Harbour Point Tower
A 38-level mixed-use tower, opened six weeks early
Delivery
CM at-risk
Value
$310M
Height
148 m

P—027
Completed
Madison, WI
Kingsgate Science Centre
A research building that stayed open to students throughout
Delivery
Design-build
Value
$142M
Gross area
21,400 m²

P—035
Completed
Joliet, IL
Eastfield Logistics Hub
86,000 m² of logistics space, enclosed before winter
Delivery
Design-build
Value
$96M
Building length
412 m
Next project

