Riverside Water Works

P—098

240 ML/d

Capacity

Riverside Water Works

Riverside Water Works

Riverside Water Works

Client

Municipal utility

Client

Municipal utility

Location

Spokane, WA

Sector

Energy & Utilities

Delivery

EPC

Value

$188M

Duration

29 months

Status

Completed

Year

2025

§ 01 — Overview

Treatment capacity doubled while the old works stayed live

Treatment capacity doubled while the old works stayed live

02

The challenge

The challenge

Doubling treatment capacity at a works that serves 400,000 people, without interrupting supply.

Doubling treatment capacity at a works that serves 400,000 people, without interrupting supply.

03

Engineering approach

Engineering approach

A new process stream was built alongside the old one, with cross-connections designed so either could run the full load during switchover.

A new process stream was built alongside the old one, with cross-connections designed so either could run the full load during switchover.

04

Execution

Execution

Commissioning ran stream by stream over six weeks, with water quality monitored continuously and no breach of permit.

Commissioning ran stream by stream over six weeks, with water quality monitored continuously and no breach of permit.

§ 05

Key metrics

240 ML/d

Capacity

400k

People served

0

Permit breaches

EPC

Delivery

Request for proposal

Planning somethingsimilar?

Tell us about scope, location, budget and timeline. A project director replies within two working days (sample commitment).

Start a proposal

Create a free website with Framer, the website builder loved by startups, designers and agencies.