§ 01 — Overview

A 1.6 km curved viaduct built without closing the valley road

A 1.6 km curved viaduct built without closing the valley road

02

The challenge

The challenge

A 1.6 km curved viaduct over a valley floor that carries the only local road and a protected creek.

A 1.6 km curved viaduct over a valley floor that carries the only local road and a protected creek.

03

Engineering approach

Engineering approach

We chose a launched-girder scheme that kept all heavy plant on the deck, eliminating falsework in the valley except at one span.

We chose a launched-girder scheme that kept all heavy plant on the deck, eliminating falsework in the valley except at one span.

04

Execution

Execution

Pier heads were precast and lifted into position, cutting the time spent working above the road by roughly half.

Pier heads were precast and lifted into position, cutting the time spent working above the road by roughly half.

§ 05

Key metrics

1.6 km

Length

34

Piers

0

Road closures

612

Precast segments

Request for proposal

Planning somethingsimilar?

Tell us about scope, location, budget and timeline. A project director replies within two working days (sample commitment).

Start a proposal

Create a free website with Framer, the website builder loved by startups, designers and agencies.